A Simple Error with Potentially Catastrophic Consequences
In polyurethane manufacturing and processing, one of the most serious mistakes that can occur during material changeovers, drum or IBC replacement, maintenance activities, or production start up is connecting the wrong raw material supply to a day tank or bulk feed system.
While this may initially appear to be a simple line connection error, the consequences can be far more severe than producing a batch of off-specification foam. If an isocyanate IBC is accidentally connected to a polyol day tank, or a polyol IBC is connected to an isocyanate day tank, a chemical reaction can begin within storage and transfer equipment that was never designed to contain an active polyurethane reaction.
https://www.linkedin.com/pulse/wrong-ibc-connection-polyurethane-processing-msnic
At Pacific Urethanes, we help you stay ahead of environmental effects with practical insights and tailored recommendations—because smart processing starts with understanding the chemistry.
📧 Email: info@pacificurethanes.com 📞 Phone: 1300 736 963
Polyurethane Formulation News Articles
Featured News Articles
See how we’ve helped in the development and production of Polyurethane Systems for Australian & export markets