Location & Job Details
- Project: Queensland Rail Critical Bridge Deck Protection.
- Applicator: Epoxy Solutions.
- Product: POLYEURO® Bridge Protection System.
- Completion: November 2015.
On-site Requirements
- Seal the leaking deck and provide long term protection of concrete surface and sub structure.
- The coating had to provide a seamless application to the concrete surface.
- Extremely fast cure to minimise the time the bridge is offline.
- Provide a membrane with superior long term protection.
Product Requirements & Benefits
- Fast cure, tough, resilient and elastomeric.
- Excellent wear resistance properties to meet the potential exposure conditions over the expected in-service life of the product.
- Seamless application of the coating system.
- Abrasion and impact resistance to withstand mechanical damage that may be encountered on the deck.